- Posted
- September 2022
Official river trial mgt ALCOR
On September 22, official river trials were held with the mgt ALCOR.
The ALCOR is equipped with diesel electric propulsion and was completed under the supervision of Bureau Veritas. The river trial went well and the vessel passed all tests.
We would like to thank the client KEM ONE for the trust and the pleasant cooperation. We also thank everyone who contributed to the completion of this beautiful ship.
At this moment, the sister ship MIZAR is also being completed by us. As soon as this ship is also finished, the ships will be jointly transported to France.